Valve Installation Requirements
1. Before installing the valve, carefully check whether the model and specification of the valve used are consistent with the design;
2. Check whether the valve can be used under the required conditions according to the model of the valve and the factory manual;
3. When the valve is hoisted, the rope should be tied to the flange connection between the valve body and the valve cover, and should not be tied to the handwheel or valve stem, so as not to damage the valve stem and the handwheel;
4. When installing the valve on the horizontal pipeline, the valve stem should be vertically upward, and the valve stem should not be installed downward;
5. When installing the valve, it is not allowed to use the forced connection method of pulling and pulling hard, so as to avoid damage due to uneven force;